Military Institute of Science and Technology
MIST Digital Archive

ANALYSIS OF MODELING RESULTS FOR RIVER BANK PROTECTION OF THE MOST VULNERABLE PART OF TAZUMUDDIN UPAZILA UNDER BHOLA DISTRICT

dc.contributor.authorAziz, Md. Abdul
dc.contributor.authorAlam, Rubayat
dc.contributor.authorMahamud, Upal
dc.contributor.authorHaque Khan, Zahirul
dc.date.accessioned2015-09-02T05:21:11Z
dc.date.available2015-09-02T05:21:11Z
dc.date.issued2009-12
dc.description.abstractBhola is the largest Island of Bangladesh situated in the south central region (latitude approximately from 430000N to 525000N and longitude 555000E to 590000E) of Bangladesh in the highly dynamic Meghna Estuary. In recent years the erosion along eastern shoreline of Bhola Island has become a serious issue. Attempts are taken to establish the base line condition to simulate the natural phenomena. Baseline condition for Tazumuddin Upazilla (under Bhola district) has been developed based on hydrodynamic and morphological modelling and historical data of bank line shifting, thalweg line shifting, bathymetric data, char movement etc. To calibrate and validate the model water levels and discharge are successfully calibrated. From modeling result, erosion/deposition pattern at and outside the protective works, new vulnerable areas due to revetment have been identified. Hydrodynamic (HD) simulations during ebb tide the maximum depth integrated near bank velocity is found within the range of 1.5-3.0 m/s along the riverbank of Tazumuddin and 1.0-1.5 m/s along the riverbank of Lalmohan. Morphological simulation shows the channel is further extended towards the south-east part. Further computational simulation showed that channel in front of Tazumuddin become deeper and it is extended more towards the south-east direction. From bathymetry survey data in May, 05 it is found that there is a tendency to deepen the channel in front of Tazumuddin where protective work was suggested and the deep channel is further extended towards south-east direction like simulation result. So it can be concluded that simulation result and real condition near Tazumuddin follows the same trend of channel development.en_US
dc.description.sponsorshipR&D Wing, MISTen_US
dc.identifier.issn1999-2009
dc.identifier.urihttp://hdl.handle.net/123456789/197
dc.language.isoenen_US
dc.publisherR&D Wing, MISTen_US
dc.relation.ispartofseriesMIST Journal of Science and Technology;Volume 1, Number 1, February 2009
dc.subjectEmbankment, bank line shifting, erosion deposition process, char movementen_US
dc.titleANALYSIS OF MODELING RESULTS FOR RIVER BANK PROTECTION OF THE MOST VULNERABLE PART OF TAZUMUDDIN UPAZILA UNDER BHOLA DISTRICTen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
09.pdf
Size:
5.71 MB
Format:
Adobe Portable Document Format
Description:
ANALYSIS OF MODELING RESULTS FOR RIVER BANK PROTECTION OF THE MOST VULNERABLE PART OF TAZUMUDDIN UPAZILA UNDER BHOLA DISTRICT

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: